Customization: | Available |
---|---|
Coating: | Coating |
Tooth Form: | Spiral Tooth |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Flute | 2 |
HRC | 45/55/60/65 |
Machine Type | Milling Tools |
Suitable for | Copper, Cast Iron, Carbon Steel, Mould Steel etc. |
Coating | AlTiN, TiAIN, TiCN, TiN |
Color | Black/Bronze/Blue/Golden |
Diameter | 1~20 mm |
Cutting Length | 3~70 mm |
Overall Length | 50~200 mm |
Raw Material | ZK30UF |
Product Keywords | solid carbide end mill,China manufacturer solid carbide end mill |
Density g/cm3 |
HRA | Co content % |
Grain Size μm |
Flexural Strength N/mm2 |
Material advantage | |
YG10X | 14.5 | 91.5 | 10 | 1 | ≥2800 | High hardness, good wear resistance and corrosion resistance |
ZK30UF | 14.3-14.6 | 92 | 10 | 0.6 | ≥3000 | High hardness and good wear resistance |
ZK40SF | 14.1 | 94.3 | 12 | 0.4-0.5 | ≥3800 | High hardness and high toughness |
GU25UF | 14.3-14.6 | 93 | 12 | 0.4 | ≥4000 | High hardness and high toughness |
Frequently Asked Questions |
(1) When can I get the price? |
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority. |
(2) How can I get a sample to check your quality? |
After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design and paper quality, we will provide you sample for free, as long as you afford the express freight. |
(3) How long can I expect to get the sample? |
After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays. You can use your own express account or prepay us if you do not have an account. |
(4) How long does the whole procedure being worked out? |
After you place a order,the production handling time is about 30 days. We need 15 days to prepare all the stuff then 15 days for manufacturing. |
(5) What about the transportation and delivery date? |
Normally we use air transport to transport the goods.It is about 5-15 days.It also depends on which country and port you are.It could be shorter if you need to send the goods like Asian. |
(6) Are you trading company or manufacturer? |
We are professional manufacturer. We not only owns our tools factory, but also have cemented carbide factory. |
(7)Where is your factory located? |
we are located in Hedong Avenue, Economic Development Zone, Shehong County, Suining City, Sichuan Province. |
(8)How about your stock? |
We have large quantity products in stock,regular types and sizes are all in stock. |
(9) ls free shipping possible? |
We don't offer free shipping service. We can have a discount if you buy a large quantity products. |